TY - JOUR
T1 - Lean Six Sigma Project Selection in a Manufacturing Environment Using Hybrid Methodology Based on Intuitionistic Fuzzy MADM Approach
AU - Singh, Mahipal
AU - Rathi, Rajeev
AU - Antony, Jiju
AU - Garza-Reyes, Jose Arturo
N1 - Publisher Copyright:
© 2022 IEEE.
PY - 2023/2/1
Y1 - 2023/2/1
N2 - Project selection has a critical role in the successful execution of the lean six sigma (LSS) program in any industry. The poor selection of LSS projects leads to limited results and diminishes the credibility of LSS initiatives. For this reason, in this article, we propose a method for the assessment and effective selection of LSS projects. Intuitionistic fuzzy sets based on the weighted average were adopted for aggregating individual suggestions of decision makers. The weights of selection criteria were computed using entropy measures and the available projects are prioritized using the multiattribute decision making approach, i.e., modified TOPSIS and VIKOR. The proposed methodology is validated through a case example of the LSS project selection in a manufacturing organization. The results of the case study reveal that out of eight LSS projects, the assembly section (A8) is the best LSS project. A8 is the ideal LSS project for swift gains and manufacturing sustainability. The robustness and reliability of the obtained results are checked through a sensitivity analysis. The proposed methodology will help manufacturing organizations in the selection of the best opportunities among complex situations, results in sustainable development. The engineering managers and LSS consultants can also adopt the proposed methodology for LSS project selections.
AB - Project selection has a critical role in the successful execution of the lean six sigma (LSS) program in any industry. The poor selection of LSS projects leads to limited results and diminishes the credibility of LSS initiatives. For this reason, in this article, we propose a method for the assessment and effective selection of LSS projects. Intuitionistic fuzzy sets based on the weighted average were adopted for aggregating individual suggestions of decision makers. The weights of selection criteria were computed using entropy measures and the available projects are prioritized using the multiattribute decision making approach, i.e., modified TOPSIS and VIKOR. The proposed methodology is validated through a case example of the LSS project selection in a manufacturing organization. The results of the case study reveal that out of eight LSS projects, the assembly section (A8) is the best LSS project. A8 is the ideal LSS project for swift gains and manufacturing sustainability. The robustness and reliability of the obtained results are checked through a sensitivity analysis. The proposed methodology will help manufacturing organizations in the selection of the best opportunities among complex situations, results in sustainable development. The engineering managers and LSS consultants can also adopt the proposed methodology for LSS project selections.
KW - Entropy method
KW - intuitionistic fuzzy (IF)
KW - lean six sigma (LSS)
KW - modified technique for order preference by similarity to ideal solution (TOPSIS)
KW - project selection
KW - Vlsekriterijumska optimisacija i kompromisno resenje (VIKOR)
UR - http://www.scopus.com/inward/record.url?scp=85100843933&partnerID=8YFLogxK
U2 - 10.1109/TEM.2021.3049877
DO - 10.1109/TEM.2021.3049877
M3 - Article
AN - SCOPUS:85100843933
SN - 0018-9391
VL - 70
SP - 590
EP - 604
JO - IEEE Transactions on Engineering Management
JF - IEEE Transactions on Engineering Management
IS - 2
ER -