Skip to main navigation Skip to search Skip to main content

Delay analysis of cooperative transmission

  • Zhiguo Ding
  • , Kin K. Leung
  • , Zhengguo Sheng
  • Imperial College London
  • The University of British Columbia

Research output: Chapter in Book/Report/Conference proceedingChapterpeer-review

Abstract

A large ETE throughput does not necessarily result in a small ETE transmission delay. The size of each packet and type of transmission schedule also play important roles in network performance. In this section, we employ an error exponent model [31] to study the transmission time of wireless networks using decode-and-forward (DAF), amplify-and-forward (AF), and multi-hop (MH) cooperative protocols.

Original languageBritish English
Title of host publicationEnergy Efficient Cooperative Wireless Communication and Networks
Pages43-64
Number of pages22
ISBN (Electronic)9781482238228
DOIs
StatePublished - 1 Jan 2014

Fingerprint

Dive into the research topics of 'Delay analysis of cooperative transmission'. Together they form a unique fingerprint.

Cite this