Delay analysis of cooperative transmission

Zhiguo Ding, Kin K. Leung, Zhengguo Sheng

Research output: Chapter in Book/Report/Conference proceedingChapterpeer-review

Abstract

A large ETE throughput does not necessarily result in a small ETE transmission delay. The size of each packet and type of transmission schedule also play important roles in network performance. In this section, we employ an error exponent model [31] to study the transmission time of wireless networks using decode-and-forward (DAF), amplify-and-forward (AF), and multi-hop (MH) cooperative protocols.

Original languageBritish English
Title of host publicationEnergy Efficient Cooperative Wireless Communication and Networks
Pages43-64
Number of pages22
ISBN (Electronic)9781482238228
DOIs
StatePublished - 1 Jan 2014

Fingerprint

Dive into the research topics of 'Delay analysis of cooperative transmission'. Together they form a unique fingerprint.

Cite this