TY - JOUR
T1 - An Extension of BIM Using AI
T2 - A Multi Working-Machines Pathfinding Solution
AU - Xiang, Yusheng
AU - Liu, Kailun
AU - Su, Tianqing
AU - Li, Jun
AU - Ouyang, Shirui
AU - Mao, Samuel S.
AU - Geimer, Marcus
N1 - Publisher Copyright:
© 2013 IEEE.
PY - 2021
Y1 - 2021
N2 - Multi working-machines pathfinding solution enables more mobile machines simultaneously to work inside of a working site so that the productivity can be expected to increase evolutionary. To date, the potential cooperation conflicts among construction machinery limit the amount of construction machinery investment in a concrete working site. To solve the cooperation problem, civil engineers optimize the working site from a logistic perspective while computer scientists improve pathfinding algorithms' performance on the given benchmark maps. In the practical implementation of a construction site, it is sensible to solve the problem with a hybrid solution; therefore, in our study, we proposed an algorithm based on a cutting-edge multi-pathfinding algorithm to enable the massive number of machines cooperation and offer the advice to modify the unreasonable part of the working site in the meantime. Using the logistic information from BIM, such as unloading and loading point, we added a pathfinding solution for multi machines to improve the whole construction fleet's productivity. In the previous study, the experiments were limited to no more than ten participants, and the computational time to gather the solution was not given; thus, we publish our pseudo-code, our tested map, and benchmark our results. Our algorithm's most extensive feature is that it can quickly replan the path to overcome the emergency on a construction site.
AB - Multi working-machines pathfinding solution enables more mobile machines simultaneously to work inside of a working site so that the productivity can be expected to increase evolutionary. To date, the potential cooperation conflicts among construction machinery limit the amount of construction machinery investment in a concrete working site. To solve the cooperation problem, civil engineers optimize the working site from a logistic perspective while computer scientists improve pathfinding algorithms' performance on the given benchmark maps. In the practical implementation of a construction site, it is sensible to solve the problem with a hybrid solution; therefore, in our study, we proposed an algorithm based on a cutting-edge multi-pathfinding algorithm to enable the massive number of machines cooperation and offer the advice to modify the unreasonable part of the working site in the meantime. Using the logistic information from BIM, such as unloading and loading point, we added a pathfinding solution for multi machines to improve the whole construction fleet's productivity. In the previous study, the experiments were limited to no more than ten participants, and the computational time to gather the solution was not given; thus, we publish our pseudo-code, our tested map, and benchmark our results. Our algorithm's most extensive feature is that it can quickly replan the path to overcome the emergency on a construction site.
KW - building information model
KW - conflict based searching
KW - construction site productivity
KW - Huoshenshan hospital project
KW - multi agents pathfinding
KW - path planning
KW - Smart working site
UR - http://www.scopus.com/inward/record.url?scp=85114733207&partnerID=8YFLogxK
U2 - 10.1109/ACCESS.2021.3110937
DO - 10.1109/ACCESS.2021.3110937
M3 - Article
AN - SCOPUS:85114733207
SN - 2169-3536
VL - 9
SP - 124583
EP - 124599
JO - IEEE Access
JF - IEEE Access
ER -